Progress stepper
>
Since v3.1.0
>
On this page
On this page
Overview
A progress stepper conveys the steps necessary to complete a process or task, and the status of each step. Steps have titles and descriptions; and each step can be in one of a number of possible states:
- inactive (yet to be performed)
- active (currently being performed)
- warn (succeeded, but with warnings)
- fail (failed to occur)
Or a custom state, set using the
iconattribute.
Usage guidelines
- Use 3-5 steps maximum to reduce cognitive load
- Designed to complement standard previous/next navigation. Avoid using as the only navigation.
- When process is completed, users cannot go back and must start over
Accessibility
- Communicates list structure and step states to screen readers
- Supports keyboard navigation for linked step titles
- Maintains logical focus order (left to right, top to bottom)
- Provides aria-current for the active step
Also known as: Wizard, Stepper
Edit element properties
Red Hat legal and privacy links
- About Red Hat
- Jobs
- Events
- Locations
- Contact Red Hat
- Red Hat Blog
- Inclusion at Red Hat
- Cool Stuff Store
- Red Hat Summit